145. The authorization holder sends to the Minister, within 60 days after the end of the restoration of the temporary work areas, a report describing the activities carried out on the site, signed and sealed by an engineer who is not employed by the enterprise that carries out the restoration work. The report must be accompanied by photographs of the entire site before its layout for the construction work, during the placing of the pipe or any pipe network in the ground and after its restoration.
1253-2018O.C. 1253-2018, s. 145.